-- card: 67820 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 64774 -- name: Customizing the Charts -- part 1 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=11 top=57 right=215 bottom=233 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: textField1 -- part 3 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=11 top=57 right=215 bottom=233 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: textField1 -- part 4 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=237 top=57 right=215 bottom=459 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: textField1 -- part contents for background part 31 ----- text ----- Working with the Charts -- part contents for background part 32 ----- text ----- Customizing the Charts -- part contents for card part 1 ----- text ----- In the Schedule Chart, you can determine what information appears around task and milestones boxes, add legends, and specify a size for the whole chart. In the timelines, you can determine which bars appear and whether slack time is indicated. and vary their widths. For the timelines and the Resource Histogram, you can set the interval of time and a date for a Time Now Line. And in the Project Table, you can display only the columns you want to see. -- part contents for background part 7 ----- text ----- -- part contents for card part 3 ----- text ----- -- part contents for card part 4 ----- text ----- And in the Project Table, you can display only the columns you want to see and vary their widths.